For a padel court you need a flat area of around 20 × 10 meters plus access, usually a building permit from the municipality and a concept for noise protection. As a guideline, a project lasts 3 to 6 months. The most important thing is to discuss the project with the building authority early on, even before you order.
- Area: Playing field 20 × 10 m plus surroundings for access and assembly.
- Permit: usually necessary, the procedure is regulated by each canton itself.
- Noise: the most critical point, padel is louder than tennis.
- Roofing: allows year-round operation, the FIP requires at least 6 m clear height.
- Models: Classic, Panoramica or Multisport Court X10.
Why a padel court is worth it
According to Swiss Tennis, the number of affiliated padel clubs rose from 13 (2024) to 52 (2025), and in September 2026 the club list had 86 Swiss members with around 304 courts.
- Little space, many Players: Four people play on each course at the same time.
- Easy to learn: This brings beginners, families and companies to the facility.
- Additional revenue: Court rental, courses, tournaments, equipment and catering. The invoice is in «What does a padel court deserve?».
In 6 steps to the padel court
Find location
Level, load-bearing area, north-south orientation outdoors, electricity, access and parking spaces. Existing tennis or hard courts can often be converted.
Clarify permits and noise
Speak to the community early, plan distance to residential zones and realistic operating times.
Choose model
Classic as a solid solution, Panoramica without posts for a clear view, X10 for several sports.
Outdoor or roofing
A roof makes the space bookable all year round and reduces noise.
Foundation, covering, light
Flat concrete slab, slope and outdoor drainage, artificial turf with quartz sand, glare-free LED light.
Plan operation
Online booking, tariffs, courses and access. A lot can be automated.
Building permit and noise protection
In Switzerland, a padel court usually needs a building permit from the municipality. The noise protection regulations do not specify any fixed limit values for sports facilities; the authorities assess this on a case-by-case basis. The details can be found in «Converting a tennis court into a padel court».
- Clear the project with the community early, even before you order.
- Plan distance from residential zones or check a roof.
- Set realistic operating times.
- Inform the neighbors openly, this prevents many Objections.
The requirements differ depending on the canton and municipality. The relevant authority is always decisive.
Classic or Panoramica?
Classic
Glass walls and steel frames, good value for money Clubs.
Panoramica
Without posts behind the glass, clear view for tournaments and spectators.
Multisport Models
Up to ten sports on one facility, interesting for communities, schools and hotels.
A Panoramica as a center court for tournaments, the other courts as Classic.
Roofing: three models
- PVC roofing: light, bright and economical.
- Metal structure: robust and durable.
- Sandwich panels: closed and well insulated, suitable for padel and tennis.
Pay attention to the clear height: The FIP requires at least 6 m over the entire court and recommends 8 m for new buildings.
This is how a project with a padel market works
- Initial consultation: Goals, location, budget.
- Planning: Model, number of courts, roofing, documents for the Approval.
- Material selection: Glass, structure, color and artificial turf.
- Design: Foundation and assembly with our partners.
- Opening: We will also support you afterwards with material and equipment.
Frequently asked questions
How much space does a padel court need?
The playing field measures 10 × 20 meters. There is also surrounding area for access, assembly and security.
Does a padel court require a building permit?
In Switzerland, generally yes. The building application goes to the municipality, each canton regulates the process itself.
How long does it take to build a padel court?
As a guideline, 3 to 6 months from planning to opening, the actual construction time is around 4 to 8 weeks.
How high does a padel hall have to be?
The FIP requires at least 6 m clear height and recommends 8 m for new buildings.
What is the difference between Classic and Panoramica?
Classic has steel posts behind the glass and is good value for money. Panoramica works without posts and offers a clear view.
Are you planning a padel court?
We advise you from the first idea to the opening, without obligation.
More about padel court construction Advice via WhatsAppThat could do it for you too interested
- Converting a tennis court into a padel court: approval, noise protection, costs and process
- What does a padel court in Switzerland earn? The invoice in CHF
- The padel club that runs itself: Automation with Playtomic, access and light
Accessed in November 2026. Tips and assessments are also based on our experience as players, trainers and specialist retailers.
- FIP: Rules of the game padel (PDF)
- Swiss Tennis: Padel statistics 2025 (PDF)
- Swiss Tennis Padel: Clubfinder, own analysis as of September 2026
- Everything for padel: Conversion of tennis court, guidelines for construction time